Get daily video updates while we’re in Vietnam next week. Join the MJ Sailing Family for behind the scenes looks & exclusive content – https://www.patreon.com/mjsailing

Remember at the end of last week’s episode when I said that big changes were coming? Well in this week’s episode, you get to see the beginning of them!

Having put in the second daggerboard case and fuel tank off camera (since there’s really no need to see it twice), we get to start building the furniture out in each hull.

On starboard side that means our inboard hanging locker, which the back of, is neighboring the nav station up on the bridge deck. We have some changes in mind for this area, and Matt highlights what they are as he measures and places in the floor of the nav station.

Over on port side, since the daggerboard case is in, that means we get to bond in the guest shower. Getting the water to flow toward the drain is our most important concern when using our thickened resin to permanently put it down….but in the excitement of it all, I may have left a little trinket forever stuck under the sole in there. : 0

We hope you enjoy!! 🙂

Much love from Annapolis!
Jessica, Matt & Georgie

Link to our boat: https://maxcruisemarine.com/max42sc-sailing-catamaran/

Thank you SO MUCH to our Patrons. These amazing supporters help keep us on the boat, our camera equipment up to date, and the videos coming. Without our patrons, these videos would not be possible.
To join the Patreon ranks, please visit http://www.patreon.com/mjsailing

or

Buy us a beer through PayPal! https://www.paypal.me/MJSailing

or

Help contribute to the build by shopping our Amazon Wish List! https://www.amazon.com/hz/wishlist/ls/2B2BOYEH9THAH?ref_=wl_share

Delivery address:
Kentmorr Marina
910 Kentmorr Road
Stevensville, MD 21666
Thank you!, Matt & Jessica

— Get Our Merchandise: https://mj-sailing.myshopify.com/

Videos made by Jessica, featuring Matt and Georgie.

00:00 – Teaser & Intro
00:58 – Nav Station Floor Extension
04:32 – Where We’re Running Wiring/Conduit
07:22 – Jessica’s First Faired Bulkheads
09:12 – Smoother Than The Production Version
10:59 – Plans To Create a Bridge Deck Stage & Extend Nav Desk
12:39 – The Master Hanging Locker/Cabinet
15:14 – Port Side Fuel Tank & Holding Tank
18:19 – Another Molded Piece Going In
20:14 – I Forever Dropped A Piece Under the Shower Pan
22:16– Closing

Music:
Arms of Gold – Tape Machines
Crackle & Chop – Dusty Decks
Dancing on the Tables – Elihah N.
Poetic Wax – Dusty Decks
Pandemonium (Tribute Version) – The Mondays

Camera equipment used:
– Panasonic Lumix GH5
– Shure VP83F shotgun microphone – https://amzn.to/2rsIHLL
– GoPro Hero8

Previous Boats: 1983 Trisalu 37 – custom aluminum, built in Quebec (Elements of Life) Where we’ve been: 2.5 year refit in Indiantown,
Florida; Abacos, Bahamas; St. Barth’s; St. Maarten; Antigua; Saba; Azores; Ireland; Scotland; Norway; England 1989
Sabre 34 Targa (Serendipity)
Where We Sailed Her: U.S. – Bahamas – Jamaica – Cuba – Cayman Islands – Honduras – Guatemala – Belize – Mexico – Bermuda – Azores – Madeira – Canary Islands – Sint Maarten – BVI’s – USVI’s

Editing software: Adobe Premier Pro
Website: http://www.mjsailing.com
Facebook: http://www.facebook.com/mattandjessicasailing