I’ve got a challenge for you!!
Through December we are just flying along with work on the bridge deck, continuously making steps forward with the galley and salon.
Matt has started attaching trim pieces to the tops of our counters, which soon I will get to fair out, as they will be the white border around all our veneered doors with hardwood trim.
Then, as I run out of areas to fair on our bigger bulkheads, I *try* to get a small project completed, which is sanding and painting the bilge on our port side. But after finding a damaged shower sump holder, Matt has to fix it before I can go futher.
But, because the starboard storage areas under the settee are now complete, that gives me the option to sand and fair those to get them ready for primer and paint. If I thought getting in the cabinets to sand and fair in the forward berth was bad, well, now I’ve met my match.
Now, we all know how long it’s taken me to work on the cabinets in our forward berth as well as the master head (although I will say that I haven’t touched them since April!!). But the question now is, how fast do you think I can get through this project?
Enjoy!!
Link to our boat: https://maxcruisemarine.com/max42sc-sailing-catamaran/
Thank you SO MUCH to our Patrons. These amazing supporters help keep us on the boat, our camera equipment up to date, and the videos coming. Without our patrons, these videos would not be possible.
To join the Patreon ranks, please visit http://www.patreon.com/mjsailing
or
Buy us a beer through PayPal! https://www.paypal.me/MJSailing
or
Help contribute to the build by shopping our Amazon Wish List!
For the build:
https://www.amazon.com/hz/wishlist/ls/2B2BOYEH9THAH?ref_=wl_share
For the boat:
https://www.amazon.com/hz/wishlist/ls/2E2TEAT8G9R1U
Delivery address:
Kentmorr Marina
910 Kentmorr Road
Stevensville, MD 21666
Thank you!, Matt & Jessica
— Get Our Merchandise: https://mj-sailing.myshopify.com/
Videos made by Jessica, featuring Matt and Georgie.
00:00 – A Solution for Routed Edges
01:53 – Intro
02:22 – Removing & Adding Foam for Counter Trim
07:15 – Prepping to fair the large aft bulkhead
08:08 – Thanks for supporting the build!!
09:52 – Trying to sand down the bilge
12:13 – I Ruined Matt’s Work
14:11 – My Hardest Area Yet – When Will I Finish?
15:30 – Closing
Music:
Different Times – Jett Everill
Felted Wool – Slowya.roll
Just Wanna Be Friends – Basixx
Keep Your Number on my Phone – Zorro
Pandemonium (Tribute Version) – The Mondays
Camera equipment used:
– Panasonic Lumix GH5
– Shure VP83F shotgun microphone – https://amzn.to/2rsIHLL
– GoPro Hero8
Previous Boats: 1983 Trisalu 37 – custom aluminum, built in Quebec (Elements of Life) Where we’ve been: 2.5 year refit in Indiantown,
Florida; Abacos, Bahamas; St. Barth’s; St. Maarten; Antigua; Saba; Azores; Ireland; Scotland; Norway; England 1989
Sabre 34 Targa (Serendipity)
Where We Sailed Her: U.S. – Bahamas – Jamaica – Cuba – Cayman Islands – Honduras – Guatemala – Belize – Mexico – Bermuda – Azores – Madeira – Canary Islands – Sint Maarten – BVI’s – USVI’s
Editing software: Adobe Premier Pro
Website: http://www.mjsailing.com
Facebook: http://www.facebook.com/mattandjessicasailing
Instagram: https://www.instagram.com/mattandjessicasailing
& https://www.instagram.com/mj_wayfaring/