Bringing Yabá from wreck to dreamy! Episode 171
In this episode of our restoration, we start installing a metal plate around our keel in the prop area, for reinforcement and protection.

👉 SUBSCRIBE to not miss out on the new episodes:
https://bit.ly/3dI3hBn

YOU CAN SUPPORT OUR PROJECT:
👉 By becoming a patron – join to unlock exclusive content:
https://www.patreon.com/sailingyaba

👉 Through Paypal donations:
https://bit.ly/3kR4Ezo or sailingyaba@gmail.com

👉 By wearing our products:
https://shopsailingyaba.com/

👉 GET OUR FAVORITE TOOLS:
https://www.amazon.com/shop/sailingyaba

We are forever grateful to everyone that is living our dream with us ♥️

🇧🇷 Legendas em Português em todos os episódios!
🇪🇸 Subtítulos en español en todos los episodios!

💙 Who are we?
We are Ben and MP!
Recently we decided to purchase a two-masted wooden schooner in Brazil. The fun detail about our story is that the boat we bought was sinking and relying on many bilge pumps to survive so we had to lift it onto the dry to start a full refit. Once the boat was lifted (for the first time in her ) we realized that the work needed was much more than expected. Between bailing or accepting the challenge, we decided to go for the second option. Watch us as we bring Yabá back to life with the help of an amazing team of traditional shipwrights, sharing every phase of the process, overcoming the highs and lows and having fun along the way.

More about us:
👉 About us + Q&A
https://youtu.be/TldDlohjwTs
👉 more info about the project
http://www.sailingyaba.com

💙 Massive thanks to our amazing team of carpenters that never let us down and continue to amaze us at every step of the process: Toninho, Zeca, Hélio, Claiton, William, Nezo, Nico, Adilson, Beto and Luiz. YOU ARE LEGENDS!