**Two massive structural components, one very stressful installation, and just 14 minutes to get everything right! π¬**
After nearly a year of sitting on the sidelines, we’re FINALLY getting back to work on the forebeam and longeron of our 44-foot DIY catamaran build!
These two pieces play a major role in connecting and supporting the bows of our boat, but getting them installed is no small task. First, we need to bond the upper and lower sections of our forebeam together using methacrylate, a powerful structural adhesive with a VERY short working time.
Once we start mixing, the clock is ticking! With roughly 14 minutes to get everything applied and positioned correctly, there’s not much room for mistakes (or unexpected surprises!).
But that’s only the beginning. We still have to maneuver the massive forebeam into place between our two hulls, secure its mounting brackets, and tackle another time-sensitive bonding job to install the longeron.
It’s a big week of progress on our five-year catamaran build, and one that brings us another step closer to finally getting this boat in the water!
Join us for Episode 384 as we tackle two of the biggest pieces still waiting to be installed on the front of our catamaran!
Thanks for watching and following along with our journey!
Matt & Jessica
#MJSailing #CatamaranBuild #BoatBuilding #DIYBoatBuild #SailingCatamaran